OL2R – The True Measure of a Machine’s Movement

OL2R is the acronym for OffLine 2 Running. OL2R is an optional program and special precision bracket set that is available for the Fixturlaser NXA Pro & Ultimate (also XA Pro & Ultimate). This option allows the shaft aligner to accurately measure vertical AND horizontal changes of machines from a static (OffLine) position to a Running position.

This allows for very precise targeting of rotating machinery during a shaft alignment while the machines are OffLine. When a precision shaft alignment is performed, the goal is to have the rotational centerlines of the machines co-linear when in a running state. Due to dynamic forces such as thermal growth or shrinkage, piping influences, and/or process pressures, the position of the machine’s rotational centerlines can change from the aligned static position to the operational position.

If known changes to a machine are going to occur from a cold static position to a running position the machines are aligned based on the given targets such as thermal offsets. When targets are used, they must be calculated or supplied to the mechanic from any number of sources, usually a plant engineer or reliability specialist, but where do they get this information?

Usually from manufacturer supplied data or calculations of some type which are typically only for changes in the vertical plane. When using the OL2R program and brackets you get REAL data regarding position changes for the specific machine(s) in question. Not only will you see any vertical changes in position, but you will also discover horizontal changes that you may not be aware are occurring. This will definitely impact the reliability of this piece of equipment and isn’t improving equipment reliability what we are trying to achieve?

The way the OL2R system works is very simple;

1st – Mount the OL2R brackets to the stationary and moveable elements of your machine. Make sure that you are able to replace coupling guards without disturbing the brackets.

ol2r-brackets-560x373

nxa1201-ol2r-mounted-on-mot-250x226

 

2nd – Take the “Live” hot reading with the machines at full running state, up to temperature and under common load and save it. The “Hot” Position will be displayed. Note: this is not an indication of the actual hot alignment, but simply a known “Hot” Position. (You can also start by taking the “Cold” readings first).

 

hot-postion-560x420

3rd – After allowing the machines to cool to ambient temperature take the cold readings and save it. The “Cold” position will be displayed. Note: This is not an indication of the actual cold alignment, but simply a known “Cold” Position.

 

cold-position-560x420

4th – Once these measurements have been saved, the NXA will compare the Cold minus Hot readings and display the REAL Targets needed to compensate for dynamic changes from Offline 2 Running. The Targets are then saved for future shaft alignments. At this point you can align the machine as indicated by the procedure. Simply touch the coupling icon and align the machine. You will now have a true precision shaft alignment.

 

targets

This is a much abbreviated explanation of the OL2R process. With training and practice this process can yield very positive results for your company or customers.

To find out more about Thermal Growth and OL2R checkout the “On Demand” Webinar hosted by VibrAlign’s Stan Riddle and Mike Keohane, entitled “Hot Alignment & Thermal Growth.” The Webinar steps through 4 ways to deal with thermal growth target values when performing a shaft alignment!

1. Inputting thermal growth targets as provided by the engineering department,
2. Using a Hot Check to measure the thermal growth and set targets,
3. Using the free ThermAlign app to calculate the thermal growth targets, and finally
4. Measuring the thermal growth, as well as dynamic changes in machinery, using OL2R software and
fixtures. (OL2R, by the way, stands for Offline to Running)

To see the recorded “On Demand” version of the webinar please visit our sponsoring partner, Plant Services [HERE]. Click the “On Demand” tab and scroll to the bottom of the list of webinars and you will see “Hot Alignment & Thermal Growth.” Click Login. You will need to set up a login to view the webinar, which lasts about an hour including questions and answers.

Additional resources for Thermal Growth from previous Alignment Blogs are:
Should Thermal Growth Affect Angular Misalignment?
By David Zdrojewski

Where Can I Get Alignment Specifications?
By Tom Shelton

Shaft Alignment Thermal Growth Targets – When You Don’t Know
By Stan Riddle

Thermal Growth Compensation – Growth versus Targets
By Patrick Lawrence

 

 

Share Blog Post

2 Comments

  1. Roberto on January 24, 2019 at 6:05 am

    Hi Tom,
    the webinar “Hot Alignment & Thermal Growth.” is no longer available on Plant services. How can I see it?
    Thanks for this useful blog.



  2. Brad Case on February 11, 2019 at 1:03 pm

    Roberto, Go to this link and the webinar is the 10th down the list. The list is blurred out until register with Plant Services. I have corrected the link on our blog.

    https://www.plantservices.com/on-demand-webinars/predictive-maintenance-condition-monitoring/



Subscribe to the
Acoem USA Blog

  • This field is for validation purposes and should be left unchanged.